Documented Camps Bay project
An existing geyser in Camps Bay sat vertically on wall brackets in a tight space under ducting. We replaced it with a horizontal unit on a supported drip tray, re-routed and insulated the pipework, left the valves reachable for future servicing, and issued a COC.
4.9 on Google · 44 reviews

The short version
The client called us to replace the water heater in a Camps Bay property. On site, the problem was less the cylinder itself and more where and how it was installed: upright on wall brackets, squeezed into a niche between extraction ducting and lighting, with almost no room to service it.
Putting a new cylinder back in the same position would have repeated those problems. Instead we converted the installation to a horizontal layout on a level platform with a drip tray, which made the valves accessible, put a drip tray beneath the cylinder, and let the hot and cold pipework run cleanly.
Before
These are the photos taken at the property before any work started.



After
The same space after the work was completed.



On the day
Ducting, lighting and electrical lines surrounded the niche, so measurements and handling had to be careful to avoid damaging them.
Moving from wall brackets to a horizontal platform meant the support had to be level and strong enough for a full cylinder of water.
The new layout had to leave the valve set and element cover reachable, so future maintenance does not mean removing the cylinder.
Worth knowing

Work is done to SANS 10254. If an existing setup cannot be brought in line, a Certificate of Compliance cannot be issued for it — so we flag it in the quote.

A conversion needs supports, a tray, a drain line, extra fittings and more time than a straight swap. That is why the written quote can differ.

A COC was issued for this installation. Keep yours with your property records alongside the written quote and invoice.
The three photos above show typical geyser installations, not this Camps Bay property.
How a visit works
We look at the space, supports, valves, discharge route and electrics before quoting.
You receive a written fixed quote for the conversion before any work starts.
Isolate, remove, prepare the platform and tray, install and re-route the pipework.
Refill, restore power and issue a Certificate of Compliance for qualifying work.

Close the main stopcock, switch the geyser off at the distribution board, photograph the damage, then call us.
Google reviews
Geyser reviews from other Cape Town customers. 4.9 out of 5 from 44 Google reviews overall.
“The Cape Town plumber was extremely responsive and came out to replace a burst geyser immediately! Would highly recommend his and his team's services. Thanks again for all of your help!”
“They assisted me with a geyser repair in Plattekloof. Was very responsive and attended to the problem promptly when my insurer due to staff inefficiencies delayed on addressing my problem over a weekend when I had reported it to them on Friday morning already.”
“I hereby would like to thank The Cape Town plumber for their quick response and excellent advice and support in managing our emergency situation with regards to our geyser leaking water through the ceiling. Jhirwaan responded to my call and i explained our predicament to him. Very professional he advised me what to do and within an hour our problem was solved. Tobias was the (registered) plumber and very competently after assessment gave feedback on the job to be done. I am very happy and satisfied of the outcome and would recommend them to anyone in and around our area in Kuilsriver.”
FAQ
Send photos of your geyser and the space around it — it helps us bring the right parts.
Usually because of the space it sits in. In this Camps Bay job the old vertical cylinder was fixed high on wall brackets in a tight niche surrounded by ducting and lighting, which left little room to reach the valves or element cover. Mounting the replacement horizontally on a level platform made room for a drip tray beneath it, kept the valve set reachable for future servicing, and let the pipework be routed neatly. Orientation is not chosen for looks: it depends on the cylinder's rating for that position, the available supports, access, and where the tray can drain. We assess those points on site and explain the options before quoting.
Generally, yes. A like-for-like swap reuses the existing position and most connections. A conversion adds a support platform, a drip tray, re-routed hot, cold and safety-valve pipework, insulation, and more time on site. The exact amount depends on access, the condition of the existing pipework and the unit you choose, so we do not publish a fixed figure for it. You receive a written fixed quote after an on-site assessment, and no work starts until you approve it. If a straight swap can be done safely and correctly in the existing position, we will tell you.
Yes. A Certificate of Compliance was issued for this Camps Bay geyser installation. A COC confirms the plumbing work meets the applicable national standard for fixed electric storage water heaters, SANS 10254, which covers points such as correctly rated safety and pressure-control valves, a drip tray where a leak could cause damage, adequate support for the cylinder and a safe discharge arrangement. Keep the certificate with your property records. If an existing installation in your home falls short of those requirements, we list what needs to change in the written quote before any work begins, rather than discovering it halfway through the job.
Yes. If your geyser is old, sits in an awkward position, drips from a valve, or you are unsure whether it has a drip tray, a planned assessment is better than waiting for a burst. Send photos of the cylinder, its label and the space around it on WhatsApp and we can tell you what to look for and arrange a visit. On site, a qualified plumber checks the valves, supports, tray, discharge arrangement and electrical isolation, then gives you a written fixed quote for anything that needs attention. If water is already escaping, close the main stopcock and switch the geyser off at the distribution board first.
We fix the cause, not just the symptom — assessed first, quoted in writing, installed to standard.