The plumber looks at the geyser and everything that keeps it safe: the pressure control valve, the safety valve, the temperature and pressure valve and where its discharge runs, the vacuum breakers and their height, the drip tray and overflow, the supports, the isolating valve, the pipework materials and insulation, and whether the geyser can be reached for maintenance. Each item is recorded as in order or as needing attention. In a Fish Hoek inspection we carried out, the findings were vacuum breakers fitted too low, a TP discharge with a 90-degree bend that was changed to two 45-degree bends, and Polycop on the TP discharge that was replaced with copper. That case study is linked on this page.